PostPosted: Sat 07 Oct 2006 21:02 
Offline

Joined: Fri 24 Mar 2006 09:53
Posts: 65
Star Shaft (formerly known as Star Mine Shaft): this CSCC-funded major capping project has now been completed.

Mark Ireland in the main shaft prior to the new capping being installed:
Image

Temporary covers (blue panels) opened to expose the walled shaft:
Image

Delivery of the specially designed capping sections:
Image

Installing the first section:
Image

Installing the second section:
Image

The CSCC would like to gratefully acknowledge the generous help, freely given, of the following people who ensured that this project ran as smoothly as possible: Chris Binding, Les Davies (the Mendip Hills AONB Warden for grant aid), Mark Ireland, Paul Wakeling (for kindly and expertly fabricating the new entrance metalwork), Doug Harris, Alan Gray, Mick Norton, Hugh Tucker, Elaine Johnson, Justin Urch and his colleagues, and Steve Bambridge of Milbury Systems for his patience and assistance.

The padlock on the cap requires the standard CSCC key.

A financial breakdown of the project is listed in the CSCC minutes of the September 06 general meeting (see CSCC website, documents section).

A low-grade survey has been done by the WCC.

Concern has been expressed about the conservation of the old mining artefacts in the level near the bottom of the shaft (which is
often flooded), and there are plans for a secondary (internal) gate to be installed lower in the mine in order to protect them. If you visit the site please leave any artefacts in situ - they should be respected as superb examples of local mining history/archaeology.

There are plans to place anchors for SRT use in the main and secondary shaft.


Top
 Profile  
 
 Post subject:
PostPosted: Sat 14 Oct 2006 23:09 
Offline

Joined: Fri 24 Mar 2006 09:53
Posts: 65
14th October 06:

Today p-anchors were installed at the second pitch head and also on the main entrance pitch (single anchor rebelay at approx -8m with a deviation at about -11m) allowing either a single free hang of 25m or a split pitch for SRT practice. The rebelay is user-friendly, situated adjacent to a convenient small ledge; the deviation* will reduce any likelihood of a rub-point.

* Cord left in situ - may be extended with sling/krab.


Top
 Profile  
 
 Post subject:
PostPosted: Sat 14 Oct 2006 23:12 
Offline

Joined: Fri 30 Dec 2005 15:48
Posts: 92
Location: Wells, Somerset, UK.
What is the water level like?

_________________
Les Williams
BCA P & I Officer & Webmaster
CSCC C&A Officer
WCC Caving Secretary
Hidden Earth Conference Manager
In my spare time I sometimes go caving...


Top
 Profile  
 
 Post subject:
PostPosted: Sun 15 Oct 2006 09:01 
Offline

Joined: Fri 24 Mar 2006 09:53
Posts: 65
The honest answer is "we didn't go down the second pitch as we had no cause to; however, now the resin is fixed (i.e. from today) it should be pretty simple to safely rig a line for SRT to bomb down and have a look; are WCC ready to gate it at the water level?


Top
 Profile  
 
 Post subject:
PostPosted: Sun 15 Oct 2006 19:12 
Offline

Joined: Fri 24 Mar 2006 09:53
Posts: 65
Placing anchors in main shaft.
Image
Pic: Andrew Atkinson


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 5 posts ] 

All times are UTC [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group